Topic: Break of Pivot line

I am trying to backtest for a strategy on break of the Pivot line. However I am not looking to just use the "Vertical Shift" option for entry. I wish to enter after the High/Low of the bar that broke through and CLOSED above/below the pivot line and then enter when the following bar takes out the High/Low of the bar that closed through the Pivot line. Is there a way to set the FSB to do this test. I havent found a way.
Thankyou.

Re: Break of Pivot line

Unfortunately it's not possible, unless PP is modified.